Skip to content
PROAV HUBSYSTEMS & HANDOVERالعربية
PROAV / SYS / 03

Exterior display systems

Exposure, assembly, publishing and safe service access.

SYS / OUTDOOR

Conceptual system map: input devices supply video and audio to the signal route and display. Control and service have separate responsibilities. Not a wiring diagram.

Input devices & content

List the input devices: presenter laptop, media player or other agreed equipment. Record the publishing account separately, with a representative Arabic/English content sample.

Add this interface to a handover
SYSTEM SCOPE

Start with the complete installation: open wall, recess, glazing or added enclosure. Record the location and observed exposure before comparing an offered model. Local climate context helps decide which observations to collect; it does not validate a product or assembly.

Bring to the demonstration

Photograph the proposed assembly and mark the air path and service route. Request the exact model’s installation documents for that configuration, then agree a readability observation with time and position.

Record the site first Build this system checklist

Interface by interface

Specify the equipment, connections and acceptance criteria with the responsible project team before the demonstration.

01
AV / content lead

Input devices & content

List the input devices: presenter laptop, media player or other agreed equipment. Record the publishing account separately, with a representative Arabic/English content sample.

Document to request

Day/evening message samples and publishing responsibility

Demonstration to agree

Play the agreed content sample from the specified media player or input device. Record text legibility, the selected video input and recovery after changing that input.

Read the related guide
02
Integrator + IT

Signal route

Trace video and audio from each input device to its intended display or audio output. Label the cable or network connection, endpoints and responsible team on the proposed signal-route drawing.

Document to request

Exterior signal-route drawing and documented connection interfaces

Demonstration to agree

Demonstrate the agreed routes from the media player or other specified input device to the display. Under the agreed test procedure, reconnect that device and record the configuration and result.

Read the related guide
03
Integrator + facilities

Display & space

Link the exact model and assembly to the mounting position, viewing points and service access. For exterior or glazed installations, record exposure and request the applicable model instructions.

Document to request

Exact-model installation instructions, installation cross-section drawing and exposure record

Demonstration to agree

Compare the proposed open wall, recess, glazing or enclosure with the applicable model documents. Record the responsible technical review separately from the dated readability observations.

Read the related guide
04
Operator + IT

Control & permissions

Identify who selects a video input, publishes a message and restores normal operation. Record the agreed account roles and control steps, without storing passwords.

Document to request

Outdoor publishing permissions, day/evening settings and recovery instructions

Demonstration to agree

Ask the intended operator to start, switch and recover the system with the supplied instructions. Record problems and the next action.

Read the related guide
05
Facilities + operator

Service & handover

Collect the as-built route, equipment list, configuration references, service instructions and a named responsibility for follow-up. Keep evidence requests separate from recorded test results.

Document to request

Safe service access, isolation responsibilities and assembly maintenance instructions

Demonstration to agree

Locate the relevant document, follow the recovery instructions and record the outcome with a responsible role and date. The project team agrees acceptance separately.

Read the related guide

Before you sign off

Keep requests, received documents and demonstrated results separate. Review the agreed criteria and project records with the responsible team.

AVIXA · Performance verification overview — external ↗