Prepare the system handover record.
Choose the system and add its checklist of device and system connection points. Record the responsible role, document reference, result and follow-up date for each point.
Start with a system
Adds five connection-point tasks. Existing records are kept.
From the systems atlas
Remove the current and saved handover checklist? Other PROAV tools are kept.
Import a saved JSON file
Replace the current checklist with the imported file? Export current work first if you need to keep it.
The current tab retains this checklist across Arabic and English. Save creates a separate copy on this device. Files are read locally and are not uploaded.
Data and privacyA recorded review is a user-entered log, not project acceptance or technical certification.
File contents
Prepared on your device. A download may be restricted by browser settings; you can copy these contents into a local file.
Download prepared file